CGC Biscayne Bay Water Mist Fire Suppression Inspection

Project ID: 70Z8526Q024276 FederalOpportunitiesSolicitation
Overview
AgencySurface Forces Logistics Center
Deadline05/15/26
Posted05/11/26
Estimated Value$3,000 - $12,000 (AI estimate)
Set AsideSBA
NAICS336611 - Ship Building and Repairing
PSCJ020 - Maint/Repair/Rebuild Of Equipment- Ship And Marine Equipment
LocationSaint Ignace, MI 49781 United States
Description
Primary Latest Change

CGC BISCAYNE BAY OPFAC

17504 LOCATION: ST IGNACE, MI EQUIPMENT: Hi-Fog Water Mist Fire Suppression System

COMPONENT AFFECTED

ANNUAL INSPECTION OF SYSTEM MPC: R-A-13380, R-M-13373, R-C-14526 Contractor must be HI-FOG certified Technician. Contractor must set up water mist system for testing; complete the water mist system test; and place water mist system back in normal operation once test is completed. Contractor must ensure all connections, fittings, and equipment within the water mist system are operating correctly as well. Contractor shall use MPC R-A-13380 as guidance. The contractor is authorized to perform minor adjustments and tuning as required to restore the system to normal operation, provided these actions do not require any new parts or incur any additional labor costs. Any discrepancy found that requires new parts or significant labor beyond the scope of a standard annual inspection shall be documented in the Final Service Report. The contractor shall not proceed with any repairs. The Government Technical Point of Contact (TPOC) will route the report to the Contracting Officer, who is the sole authority for authorizing any work that results in additional cost. POP: 25MAY26-28MAY26 LOCATION/POC: Witko, Shane CWO-2 USCG CGC BISCAYNE BAY (USA) Shane.d.witko@uscg.mil Address: CGC BISCAYNE BAY WTGB (104)

1075 HURON ST

ST IGNACE, MI 49781-0000 958-285-2047

Summary (Newest Update)

Background The contract is issued by the U.S. Coast Guard for the CGC BISCAYNE BAY, located in St. Ignace, MI. The mission of this contract is to ensure the operational readiness and safety of the Hi-Fog Water Mist Fire Suppression System through annual inspections and maintenance. Work Details The contractor must be a HI-FOG certified Technician. Responsibilities include setting up the water mist system for testing, completing the water mist system test, and returning the system to normal operation after testing. The contractor must verify that all connections, fittings, and equipment within the water mist system are functioning correctly, following guidance from MPC R-A-13380. The contractor is authorized to make minor adjustments and tuning necessary to restore normal operation without requiring new parts or incurring additional labor costs. Any discrepancies that necessitate new parts or significant labor beyond a standard annual inspection must be documented in a Final Service Report. The contractor is prohibited from proceeding with repairs; such actions require authorization from the Government Technical Point of Contact (TPOC) and the Contracting Officer. Period of Performance The period of performance for this contract is from May 25, 2026, to May 28, 2026. Place of Performance The work will be performed at CGC BISCAYNE BAY WTGB (104), 1075 HURON ST, ST IGNACE, MI 49781-0000.

Contacts
Contact nameMcTague, Sean
Contact emailsean.p.mctague@uscg.mil
Contact phone15716143888
Secondary contact nameULISES BALMACEDA
Secondary contact emailulises.o.balmaceda@uscg.mil
Secondary contact phone(206) 820-0307
Same Region Opportunities