The City of Wichita is seeking bids from firms to provide construction services for the Public Works & Utilities Department. The project, titled WDS SWD #797 SS Phase 2, aims to serve the Meridian 53 Second Addition and is part of the city's ongoing development efforts.

Work Details

The contract includes various construction tasks categorized into lump sum and measured quantity bid items. Key items include: - Site Clearing (1 LS) - Site Restoration (1 LS) - Temporary Seeding (1 LS) - Pipe installation: 300 LF of 8" WL pipe, 12 LF of 8" WL (DICL), and various sizes of SWS pipes (15" and 24"). - Valve Assemblies including an anchored 8" special valve assembly and a blowoff valve assembly. - Manholes including shallow and standard types, with specific quantities detailed in the bid items. - Concrete encasement for pipes and construction entrance BMPs.

Period of Performance

The estimated project start date is April 15, 2025, with a completion date set for December 31, 2030. This indicates a performance period of approximately 5.5 years.

Place of Performance

The geographic location for this contract is at the Meridian 53 Second Addition site, specifically at the address: 3005 W 53rd St N, Wichita, Kansas.

Bidder Requirements

Bidders must comply with local regulations and may need to demonstrate qualifications related to stormwater management practices as outlined in the Stormwater Pollution Prevention Plan (SWPPP). Specific certifications or licenses required for subcontractors are not detailed in the solicitation.