FY26 NRM -AE Remodel Building 41 610-26-103
Agency: VISN 10: Healthcare System
Location: Indiana
NAICS: 541310
| Agency | USACE Louisville District |
|---|---|
| Deadline | 05/27/26 |
| Posted | 05/08/26 |
| Estimated Value | $25,000 - $60,000 (AI estimate) |
| Set Aside | None |
| NAICS | 238160 - Roofing Contractors |
| PSC | Z2KA - Repair Or Alteration Of Dams |
| Location | Location: 10064 Overlook Rd, Brookville, IN 47012 Brookville, IN 47012 USA |
CONTROL TOWER ROOF REPLACEMENTPROJECT LOCATION: BROOKVILLE LAKE, 10064 OVERLOOK ROAD, BROOKVILLE, IN 47012The contractor shall provide a turn-key project to replace the existing 31? x 35? EPDM roof system on the ControlTower with a new, fully adhered .060 TPO roof system. The work includes all demolition, substrate inspection andrepair, installation of new insulation and membrane, and all associated detail and flashing work to provide acomplete, watertight roofing assembly.
Background The project involves the replacement of the Control Tower roof at Brookville Lake, located at 10064 Overlook Road, Brookville, IN. The agency aims to ensure the integrity and functionality of the Control Tower through this roofing project, which is critical for maintaining operational capabilities. Work Details The contractor shall provide a turn-key project to replace the existing 31' x 35' EPDM roof system on the Control Tower with a new, fully adhered .060 TPO roof system. The work includes: - Demolition and Preparation: Removal and proper disposal of the existing EPDM roofing membrane down to the existing insulation layer; thorough inspection of exposed insulation and underlying metal decking for moisture or damage; reporting and correcting any deficiencies. - New Insulation and Membrane Installation: Installation of one layer of 1.5” polyisocyanurate insulation over existing insulation, mechanically fastened; installation of a new .060 white reinforced TPO membrane over new insulation, with all seams heat-welded for waterproofing. - Detailing and Flashing: Flashing all roof penetrations using .060 white TPO flashing material; installation of new hot-pipe flashing with a minimum 1-inch air gap for heated vent pipes; extending TPO membrane up perimeter parapet walls secured with a termination bar; installation of new 24-gauge steel counter-flashing over the termination bar along parapet walls. Period of Performance The contractor shall commence work within 14 calendar days after receiving the notice to proceed (NTP) and complete all work ready for use no later than 45 calendar days after receipt of the NTP. Place of Performance Brookville Lake, 10064 Overlook Road, Brookville, IN 47012
| Contact name | Kelly Duggins |
|---|---|
| Contact email | kelly.s.duggins@usace.army.mil |
| Contact phone | (502) 315-6594 |
Agency: VISN 10: Healthcare System
Location: Indiana
NAICS: 541310
Agency: Virginia National Guard
Location: Indiana
NAICS: 722310
Agency: Reserve Command
Location: Indiana
NAICS: 238220
Agency: Reserve Command
Location: Indiana
NAICS: 238220