MCAS Miramar Fuels Lab Construct

Project ID: W9128F25RA068 FederalOpportunitiesSources Sought
Overview
AgencyUSACE Omaha District
Deadline05/22/26
Posted05/08/26
Estimated Value$1,500,000 - $4,500,000 (AI estimate)
Set AsideSBA
NAICS237120 - Oil and Gas Pipeline and Related Structures Construction
PSCZ2NA - Repair Or Alteration Of Fuel Supply Facilities
LocationSan Diego, CA 92145 United States
Description
Primary Latest Change

This project consists of demolition and construct/renovate the Fuel Laboratory Facility 9647 (CLIN 0001). The existing structure is in relatively good condition, therefore the building will be completely renovated. Environmental considerations of this project includes demolition with hazardous building materials survey and abatement. Prevent environmental pollution and damage that may occur as a result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work must be protected during the entire duration of this contract.

Summary (Newest Update)

Background The project involves the demolition and complete renovation of the Fuel Laboratory Facility 9647 at MCAS Miramar. The existing structure is in relatively good condition, and the renovation aims to enhance its functionality while ensuring environmental safety. The agency's mission includes preventing environmental pollution and protecting resources during construction operations. Work Details The scope of work includes demolition activities that require a hazardous building materials survey and abatement. The contractor must ensure that environmental resources within the project boundaries, as well as those affected outside the limits of permanent work, are protected throughout the contract duration. The project also necessitates compliance with local, state, and federal laws regarding hazardous material handling, particularly for petroleum-based products or chemicals. Additionally, contractors must have experience in constructing or renovating facilities on active military bases and adhere to UFGS or UFC standards. Period of Performance 410 calendar days from the notice to proceed (NTP) for construction. Place of Performance MCAS Miramar

Contacts
Contact nameSteven Engen
Contact emailsteven.d.engen@usace.army.mil
Contact phone(402) 995-2233
Secondary contact nameRobert Ragos
Secondary contact emailrobert.j.ragos@usace.army.mil
Secondary contact phone(860) 524-4917
Same Region Opportunities