Marine Security Guard Residence Gym concrete restoration

Project ID: 19CF2026Q0009 FederalOpportunitiesSynopsis Solicitation
Overview
AgencyU.S. Embassy In Brazzaville
Deadline05/12/26
Posted05/08/26
Estimated Value$20,000 - $60,000 (AI estimate)
Set AsideNone
NAICS238110 - Poured Concrete Foundation and Structure Contractors
PSCZ2QA - Repair Or Alteration Of Restoration Of Real Property (Public Or Private)
LocationBLVD DENIS SASSOU NGUESSO 70-83 CENTREVILLE Brazzaville Congo (Brazzaville)
Description
Primary Latest Change

The US Embassy in Brazzaville requires the services of the contractor to perform the Marine Security Guards' Residence (MSGR) Gym Room Repairs to the existing finished concrete slab-on-grade structure measuring 8.68 m 5.56 m.

Summary (Newest Update)

Background The US Embassy in Brazzaville requires the services of a contractor to perform repairs on the Marine Security Guards’ Residence (MSGR) Gym Room. The goal of this contract is to restore the structural integrity of the gymnasium floor, which has deteriorated due to heavy weightlifting activities, ensuring safe operation and extending the service life of the facility. Work Details The contractor shall complete the following tasks: 1. Demolish and safely remove the existing deteriorated concrete slab-on-grade beneath the gymnasium floor. 2. Prepare a work plan for the MSGR Gym Slab-on-grade repairs project, which must be approved by the Contracting Officer's Representative (COR). 3. Construct a new reinforced concrete slab-on-grade designed to withstand repetitive heavy impact loads associated with weightlifting activities. 4. Pour blinding concrete of 100 mm thickness using 350 kg of cement per cubic meter mixed with gravel and sand, compacted as specified. 5. Pour concrete at a thickness of 200 mm (0.49 ft) with a strength of 23 MPA after 7 days; premixed concrete will be provided by the government while rebar (type 8) and associated materials are to be furnished by the contractor. 6. Pressure wash the concrete slab to remove debris in preparation for gym flooring installation, which must be performed according to manufacturer instructions by an experienced installer. 7. Conduct final deep cleaning of the gym room environment before handover to COR. Period of Performance The contractor shall commence work promptly and achieve final completion and acceptance, including final cleanup, within 12 business days. Place of Performance All work will be performed onsite at the Marine Security Guards’ Residence.

Contacts
Contact nameChilango Glhane
Contact emailchilangoge@state.gov
Contact phone242066122012
Secondary contact nameCharlem Issombo
Secondary contact emailissombonce@state.gov
Secondary contact phone242066122094
Same Region Opportunities

No same-region records available.