Feasibility Study for Payload Processing Facility for Nuclear Operations
Agency: Kennedy Space Center
Location: Florida
NAICS: 541990
| Agency | Agricultural Research Service |
|---|---|
| Deadline | 06/08/26 |
| Posted | 05/07/26 |
| Estimated Value | Not Provided |
| Set Aside | SBA |
| NAICS | 236220 - Commercial and Institutional Building Construction |
| PSC | Z2JZ - Repair Or Alteration Of Miscellaneous Buildings |
| Location | Fort Pierce, FL 34945 United States |
The United States Department of Agriculture (USDA), Agricultural Research Service (ARS), has a requirement for tornado damage repairs at the USDA-ARS U.S. Horticultural Research Laboratory in Ft. Pierce, Florida. The Contractor shall provide all labor, equipment, and materials and perform all required work in accordance with the specifications and drawings. The USDA-ARS U.S. Horticulture Research Laboratory in Ft Pierce, Florida will be renovated / repaired after recent tornado damage affected multiple sites and buildings. There are three sites that were affected: the USDA-ARS U.S Horticulture Laboratory in Ft. Pierce, the Picos Farm in Ft. Pierce, and Whitmore Farm in Leesburg. The project will be phased to allow for continued use during construction to allow for the transition of research projects to different greenhouses. The total estimated area is 48,000 sq ft of greenhouses (27 standard greenhouses at approximately 1,750 sq ft each and 4 conditioned greenhouses at approximately 240 sq ft each) with an additional 20,000 sq ft of hallways, vents, and intake screening. Option pricing may also be utilized in this procurement. The work at USDA-ARS U.S Horticulture Laboratory is anticipated to be solicited in the following phases. Phase 1 will consist of demolishing and replacing 9 standard greenhouses, a corridor, vents, and intake screening totaling approximately 20,500 sq ft and repairs to the roofing of the main building. These greenhouses are the most damaged from the tornado damage and currently are unable to be occupied and used. Phase 2 will consist of demolishing and replacing 8 standard greenhouses, 4 conditioned greenhouses, corridors, vents, and intake screening totaling approximately 24,000 sq ft and replacing mechanical units on two storage buildings adjacent to the greenhouses. Phase 3 will consist of demolishing and replacing 4 standard greenhouses, corridor, vents, and intake screening totaling approximately 11,000 sq ft. Phase 4 will consist of demolishing and replacing 6 standard greenhouses, vents, and intake screening totaling approximately 12,500 sq ft. Picos Farm has 1 greenhouse and 1 hoophouse that will be fully demolished and reconstructed in the same locations. This will be approximately 3,350 sq ft of new structures on the research section of Picos Farm. The other section of the Picos Farm site is near the pond. Three prefabricated, open sided, steel structures with metal roofs that meet current Florida codes for wind resistance will be placed on existing slabs over pumps and mechanical systems to adequately protect them. Whitmore Farm in Leesburg, Florida, has two existing greenhouses that will be fully demolished including the slabs. A third greenhouse will be fully reskinned and repaired as there is significant damage to the facade system. A new prefabricated pesticide storage building will be built on an existing slab on the west side of the site and the existing small storage structure on the side of an existing building demolished. Two existing pump house structures will be demolished and the disturbed area leveled out with the existing grade. All greenhouse systems will contain new microgrow control systems, be brought up to Florida containment requirements, and have venting systems properly meshed. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is more than $10,000,000.00. USDA will issue a Firm Fixed Price construction contract. The NAICS Code is anticipated to be 236220 Commercial and Institutional Building Construction with a size standard of $45 Million. Potential Offerors are responsible for monitoring this site for release of any amendments. All offerors shall be registered with the System for Award Management Registration per FAR Clause 52.204-7 and 52.204-8. No paper copies of the solicitation will be mailed and telephone requests will not be honored. A site showing will be held on Wednesday, May 20, at 8:30 a.m. Eastern. Attendance is mandatory to submit an offer. Queestions are due on or after May 26, 2026, at 1:00 p.m. Eastern. Questions received after that date and time will not be answered.
Background The United States Department of Agriculture (USDA), Agricultural Research Service (ARS), has a requirement for tornado damage repairs at the USDA-ARS U.S. Horticultural Research Laboratory in Ft. Pierce, Florida. The goal of this contract is to restore and renovate the facilities affected by recent tornado damage, ensuring that research activities can continue without significant disruption. Work Details The project involves extensive renovations and repairs across three sites: the USDA-ARS U.S. Horticulture Laboratory in Ft. Pierce, Picos Farm in Ft. Pierce, and Whitmore Farm in Leesburg. The total estimated area for renovation includes 48,000 sq ft of greenhouses (27 standard greenhouses at approximately 1,750 sq ft each and 4 conditioned greenhouses at approximately 240 sq ft each) along with an additional 20,000 sq ft of hallways, vents, and intake screening. The work will be executed in four phases: 1. Phase 1: Demolition and replacement of 9 standard greenhouses, a corridor, vents, and intake screening totaling approximately 20,500 sq ft; repairs to the roofing of the main building. 2. Phase 2: Demolition and replacement of 8 standard greenhouses, 4 conditioned greenhouses, corridors, vents, and intake screening totaling approximately 24,000 sq ft; replacement of mechanical units on two adjacent storage buildings. 3. Phase 3: Demolition and replacement of 4 standard greenhouses, corridor, vents, and intake screening totaling approximately 11,000 sq ft. 4. Phase 4: Demolition and replacement of 6 standard greenhouses, vents, and intake screening totaling approximately 12,500 sq ft. Additionally at Picos Farm: demolition and reconstruction of a greenhouse and hoophouse totaling approximately 3,350 sq ft; installation of three prefabricated steel structures over existing slabs for protection against wind. At Whitmore Farm: demolition of two existing greenhouses including slabs; reskinning and repair of a third greenhouse; construction of a new pesticide storage building on an existing slab; demolition of two pump house structures. Period of Performance The Contractor shall begin performance within ten calendar days after receiving the award and complete it within three hundred sixty-five calendar days. Place of Performance The majority of the work will be performed in Ft. Pierce, Florida with additional work at Picos Farm in Ft. Pierce and Whitmore Farm in Leesburg.
| Contact name | Erin Riffey |
|---|---|
| Contact email | erin.riffey@usda.gov |
| Contact phone | 19706312294 |
Agency: Kennedy Space Center
Location: Florida
NAICS: 541990
Agency: USACE Mobile District
Location: Florida
NAICS: 237110
Agency: Surface Forces Logistics Center
Location: Florida
NAICS: 238210
Agency: NPS Southeast Region
Location: Florida
NAICS: 238320