DPW Trench Drains Replacement
Agency: Town of Weston [MA]
Location: Massachusetts
NAICS: Not Provided
| Agency | Town of Belchertown [MA] |
|---|---|
| Deadline | 06/04/26 |
| Posted | 05/07/26 |
| Estimated Value | $1,800,000 - $4,200,000 (AI estimate) |
| Set Aside | Not Provided |
| NAICS | Not Provided |
| PSC | Not Provided |
| Location | Massachusetts |
The Work for this Project includes, but is not limited to: replacement of the existing culvert crossing of Hop Brook (Bridge No. B-05-028), raising of Warren Wright Road, and the addition of a terrestrial organism passage. Work items include excavation and off-site disposal; installation of a bridge crossing and culvert; construction of gabion basket retaining walls; removal, raising, and reconstruction of Warren Wright Road; and restoration of the site.
Agency: Town of Weston [MA]
Location: Massachusetts
NAICS: Not Provided
Agency: Town of Mashpee [MA]
Location: Massachusetts
NAICS: Not Provided
Agency: Town of North Attleboro [MA]
Location: Massachusetts
NAICS: Not Provided
Agency: Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division [MA]
Location: Massachusetts
NAICS: Not Provided