Repair Intersection Runway 03-21 & 15-33

Project ID: FA441826R0012 FederalOpportunitiesSolicitation
Overview
AgencyAir Mobility Command
Deadline06/15/26
Posted05/07/26
Estimated Value$12,000,000 - $22,000,000 (AI estimate)
Set AsideNone
NAICS237310 - Highway, Street, and Bridge Construction
PSCY1BD - Construction Of Airport Runways And Taxiways
LocationJoint Base Charleston – Air Base North Charleston, SC 29404 United States
Description
Primary Latest Change

Includes performance of construction contract administration (Critical Path Method Scheduling, submittal management and closeout), multi-discipline efforts involving work on a secure Runway. Additionally, relevant performance includes performance of multi-discipline efforts involving removal and replacement of 136 individual pavement panels that measure 25 ft wide x 25 ft long x 24 inches deep, located at the intersection of the primary and secondary runway. Ability to perform work between hours of 2300-0700 hours Thursday through Monday. The work involves 3 primary activities each night including saw cutting, removal and installation of temporary panels, and placement of permanent panels. Show ability to construct permanent panels from fast setting concrete, capable of achieving the strength to handle aircraft traffic during a 3 -4-hour cure period. The runway intersection shall be open for daily aircraft traffic each morning. The project necessitates specialized capabilities and equipment, such as sawing and removal equipment for 24-inch pavement and volumetric mixers, sufficient in quantity to place a minimum of 50 cubic yards of fast setting concrete. Ancillary work includes milling and overlay of existing asphalt shoulders, installation of new runway centerline and edge lightings within the limits of work, installation of runway markings, pavement grinding for smoothness and pavement grooving, and incidental work that is similar or greater in scope, magnitude, and complexity than the effort described in this solicitation (Runway Asphalt and Concrete Repair and The evaluation of past performance information will take into Paving). Last, show ability to provide a work force capable of gaining clearance onto a secure flightline

Summary (Newest Update)

Background The contract is issued by the United States Air Force at Joint Base Charleston - Air Base, located in North Charleston, South Carolina. The mission of the agency includes maintaining and repairing critical infrastructure to ensure operational readiness. The goal of this contract is to perform essential runway repairs that will facilitate safe aircraft operations and enhance the overall functionality of the airbase. Work Details The scope of this project includes the removal and replacement of 136 individual pavement panels, each measuring 25 ft wide x 25 ft long x 24 inches deep, located at the intersection of the primary and secondary runways. Work will be conducted during nighttime hours from Thursday to Monday, specifically between 2300-0700 hours. The project involves three primary activities each night: saw cutting, removal and installation of temporary panels, and placement of permanent panels made from fast-setting concrete that can achieve sufficient strength for aircraft traffic within a 3-4 hour cure period. Additionally, ancillary work includes milling and overlaying existing asphalt shoulders, installing new runway centerline and edge lighting, runway markings, pavement grinding for smoothness, pavement grooving, and other incidental work similar in scope and complexity to runway asphalt and concrete repair. Place of Performance Joint Base Charleston - Air Base, North Charleston, South Carolina.

Contacts
Contact nameBrian T. Hawk
Contact emailbrian.hawk@us.af.mil
Contact phone(843) 963-5165
Secondary contact nameRobert R. Melton
Secondary contact emailrobert.melton.6@us.af.mil
Secondary contact phone(843) 963-5173
Same Region Opportunities