LU OKC Roof Replacement - Phase 3
Agency: Oklahoma A&M System [OK]
Location: Oklahoma
NAICS: Not Provided
| Agency | AFLCMC Tinker AFB |
|---|---|
| Deadline | 05/11/26 |
| Posted | 05/07/26 |
| Estimated Value | $50,000,000 - $200,000,000 (AI estimate) |
| Set Aside | None |
| NAICS | Not Provided |
| PSC | R425 - Support- Professional: Engineering/Technical |
| Location | Tinker AFB, OK 73145 United States |
The Air Force Life Cycle Management Center (AFLCMC) is conducting market research to identify sources capable of serving as a neutral, program-controlled integrator to address parts obsolescence and regenerate the B-2 Spirit bomber supply chain through reverse engineering and technical data package (TDP) development. Viable respondents must be established defense contractors possessing demonstrated integration experience for low-density strategic aircraft fleets, extensive in-house reverse engineering expertise, and specialized SAP-cleared facilities capable of accommodating multiple large-body aircraft. Due to inherent Organizational Conflicts of Interest (OCI) with this specific effort, the B-2 Original Equipment Manufacturers (OEMs) and their primary mission-system affiliates shall not be considered for award and should NOT respond to this notice. Potential vendors should review the attached document and submit a capability statement if, and only if, they possess verifiable evidence of meeting every mandatory qualification and the infrastructure requirements outlined in the synopsis.
| Contact name | Garrett Chase |
|---|---|
| Contact email | garrett.chase@us.af.mil |
| Contact phone | (405) 739-7185 |
Agency: Oklahoma A&M System [OK]
Location: Oklahoma
NAICS: Not Provided
Agency: Chickasaw Nation [OK]
Location: Oklahoma
NAICS: Not Provided
Agency: Chickasaw Nation [OK]
Location: Oklahoma
NAICS: Not Provided
Agency: Chickasaw Nation [OK]
Location: Oklahoma
NAICS: Not Provided