Papillion Creek Water Resource Recovery Facility Roofing Project
| Agency | Douglas County [NE] |
|---|---|
| Deadline | 06/03/26 |
| Posted | 05/06/26 |
| Estimated Value | $250,000 - $900,000 (AI estimate) |
| Set Aside | Not Provided |
| NAICS | Not Provided |
| PSC | Not Provided |
| Location | Nebraska |
Background
The City of Omaha is seeking bids for the construction of the OPW 55169 project, which involves the replacement of roofing systems at the Papillion Creek Water Resource Recovery Facility (PCWRRF). The project aims to enhance the facility's infrastructure and ensure compliance with safety and operational standards. The work will be conducted at 15705 Harlan Lewis Road, Bellevue, NE, as part of the City’s commitment to maintaining essential public services.
Work Details
The scope of work includes: 1. Removal of the existing Thermoplastic Polyolefin (TPO) Roofing Membrane. 2. Replacement of damaged insulation. 3. Installation of ½" protection board over the insulation. 4. Installation of a new TPO Roofing Membrane System covering both the administration building roof and the operations building roof in their entirety.
Period of Performance
The anticipated Notice to Proceed date is Monday, July 13, 2026.
Place of Performance
The contract will be performed at Papillion Creek Water Resource Recovery Facility, located at 15705 Harlan Lewis Road, Bellevue, NE, 68123.
Bidder Requirements
Bidders must possess a 'Class A or B' City of Bellevue General Contractor's License at the time of bid submission. Additionally, this bid has a Small and Emerging Business (SEB) reserve; SEB authorized bidders are prioritized for contract award. Non-SEB authorized bids will only be considered if no SEB bids are received. Bidders must also submit a bid bond from a surety company licensed in Nebraska and listed on Circular 570 by the U.S. Department of Treasury.
No same-region records available.