Pavement Repair

Project ID: 12639526Q0110 FederalOpportunitiesSynopsis Solicitation
Overview
AgencyMarketing and Regulatory Programs Business Services
Deadline05/15/26
Posted05/04/26
Estimated Value$350,000 - $750,000 (AI estimate)
Set AsideSBA
NAICS237310 - Highway, Street, and Bridge Construction
PSCY1LB - Construction Of Highways, Roads, Streets, Bridges, And Railways
LocationMemphis, TN 38133 United States
Description
Primary Latest Change

Posted: April 17, 2026, 10:53 a.m. EDT The entire paved area at the Memphis Cotton Classing Facility is in a severe state of disrepair and must be replaced. The surfaces were first paved in 1995. There is poor drainage and water intrusion to the subbase, leading to severe degradation. Solicitation documents are posted below.

2 (Newest Update)

Posted: April 21, 2026, 1:15 p.m. EDT The entire paved area at the Memphis Cotton Classing Facility is in a severe state of disrepair and must be replaced. The surfaces were first paved in 1995. There is poor drainage and water intrusion to the subbase, leading to severe degradation. Solicitation documents are posted below. Amendment 1 is posted below.

3: Posted: April 22, 2026, 11:37 a.m. EDT The entire paved area at the Memphis Cotton Classing Facility is in a severe state of disrepair and must be replaced. The surfaces were first paved in 1995. There is poor drainage and water intrusion to the subbase, leading to severe degradation. Solicitation documents are posted below. Amendment 1 is posted below. Regarding amendment 1 incorporating pavement striping, acrylic paint is required, and the striping should match existing.
Current: Posted: May 4, 2026, 3:08 p.m. EDT The entire paved area at the Memphis Cotton Classing Facility is in a severe state of disrepair and must be replaced. The surfaces were first paved in 1995. There is poor drainage and water intrusion to the subbase, leading to severe degradation. Solicitation documents are posted below. Amendment 1 is posted below. Regarding amendment 1 incorporating pavement striping, acrylic paint is required, and the striping should match existing. RFIs: Can you provide the dimensions of the sink hole that was covered and how you would like to fill it? See photos below for dimensions. Clear the hole, dig out the debris, fill with appropriate material (ie, 3/4 gravel), asphalt with back lot. With this being in 3 phases, will the project require 3 mobilizations? Depending on the necessary schedule, yes it may.
Contacts
Contact nameJim Roloff
Contact emailjames.g.roloff@usda.gov
Contact phone(612) 590-7603
Same Region Opportunities

SolaHD Items

Agency: Department of Energy

Location: Tennessee

NAICS: 335999