26-08 Asphalt-Rubber Surface Treatment Stress Absorbing Membrane (SAM)
| Agency | Town of Wolcott [CT] |
|---|---|
| Deadline | 05/27/26 |
| Posted | 05/03/26 |
| Estimated Value | $500,000 - $1,500,000 (AI estimate) |
| Set Aside | Not Provided |
| NAICS | Not Provided |
| PSC | Not Provided |
| Location | Connecticut |
The Town of Wolcott requests bids from qualified contractors for ASPHALT-RUBBER SURFACE TREATMENT STRESS ABSORBING MEMBRANE (SAM) for up to 10 miles of Town roadways. Work to include labor, equipment and materials. The work will be performed in accordance with CT Statutes governing Prevailing Wage Rates as applicable.
Summary (Newest Update)
Background The Town of Wolcott is seeking bids from qualified contractors for the Asphalt-Rubber Surface Treatment Stress Absorbing Membrane (SAM) project. This initiative aims to enhance the durability and longevity of up to 10 miles of Town roadways, aligning with the agency's commitment to maintaining and improving local infrastructure. The work will be conducted in compliance with Connecticut Statutes governing Prevailing Wage Rates. Work Details Contractors are required to provide labor, equipment, and materials necessary for the application of Asphalt-Rubber Surface Treatment Stress Absorbing Membrane (SAM) on designated roadways. The project encompasses a total of up to 10 miles of Town roadways, ensuring that all work adheres to applicable regulations and standards. Period of Performance The contract performance period is from May 03, 2026, at 7:00 AM EDT to May 27, 2026, at 1:00 PM EDT. Place of Performance The work will be performed on various roadways within the Town of Wolcott, Connecticut. Bidder Requirements Bids are open to all vendors. Contractors must comply with Connecticut Statutes regarding Prevailing Wage Rates.
| Contact name | Natalie Clark |
|---|---|
| Contact email | bids@wolcottct.org |
| Contact phone | 203-879-8100 |
No same-region records available.