127EAX26Q0016 Nogales Waterline Connection - Coronado NF
Agency: USFS Region 5: Pacific Southwest Region
Location: Arizona
NAICS: 237110
| Agency | USFS Region 5: Pacific Southwest Region |
|---|---|
| Deadline | 06/01/26 |
| Posted | 04/30/26 |
| Estimated Value | $600,000 - $1,200,000 (AI estimate) |
| Set Aside | SBA |
| NAICS | 237310 - Highway, Street, and Bridge Construction |
| PSC | Y1LB - Construction Of Highways, Roads, Streets, Bridges, And Railways |
| Location | Tucson, AZ 85701 United States |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX26Q0021 is issued as a Request for Quotation (RFQ) to develop the Lone Mountain Quarry for road surfacing aggregate production. Lone Mountain Quarry is located on previously undisturbed land on the Sierra Vista Ranger District of the Coronado National Forest. Work consists of rock blasting and excavating, rock crushing and stockpiling. This acquisition is set aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310, Highway, Street, and Bridge Construction. The small business size standard is $45M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Background The solicitation number 127EAX26Q0021 is issued by the USDA Forest Service for the development of the Lone Mountain Quarry located on previously undisturbed land within the Sierra Vista Ranger District of the Coronado National Forest. The goal of this contract is to produce road surfacing aggregate through various construction tasks, aligning with the agency's mission to manage and protect national forests and grasslands. Work Details The work includes rock blasting, excavating, rock crushing, and stockpiling. Specific tasks outlined in the Statement of Work (SOW) include: clearing and grubbing of the area needed for aggregate quantity, topsoil stripping and stockpiling, and crushing and stockpiling a total of 11,000 cubic yards (CY) of surface course aggregate with 'G' grading. Additionally, there are additive bid items for crushing and stockpiling an extra 2,200 CY, 1,200 CY (twice), and 1,000 CY of surface course aggregate. All work must comply with the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) and Forest Service Supplemental Specifications (FSSS). The contractor is responsible for obtaining all necessary permits from the Arizona Department of Environmental Quality. Period of Performance The contract performance period is from June 15, 2026, to December 31, 2026. The contractor must commence work within 10 calendar days after receiving notice to proceed and complete all work within a total of 60 calendar days. Place of Performance The construction projects will be performed at Lone Mountain Quarry located in the Sierra Vista Ranger District of the Coronado National Forest in Arizona.
| Contact name | Richard Ortega |
|---|---|
| Contact email | richard.ortega@usda.gov |
| Contact phone | None |
Agency: USFS Region 5: Pacific Southwest Region
Location: Arizona
NAICS: 237110
Agency: Central Federal Lands Highway Division
Location: Arizona
NAICS: 237310
Agency: VISN 21: Sierra Pacific Network
Location: Arizona
NAICS: 531120
Agency: Indian Health Service
Location: Arizona
NAICS: 513210