Conductor & Static T-Lines
Agency: Department of Energy
Location: South Dakota
NAICS: 332510
| Agency | USFS Region 2: Rocky Mountain Region |
|---|---|
| Deadline | 05/11/26 |
| Posted | 04/28/26 |
| Estimated Value | $1,000,000 - $5,000,000 (value based on agency estimated range) |
| Set Aside | SBA |
| NAICS | 237110 - Water and Sewer Line and Related Structures Construction |
| PSC | Y1NE - Construction Of Water Supply Facilities |
| Location | Custer, SD 57730 United States |
POC Erick Plamann, Contract Specialist, erick.plamann@usda.gov
The contractor will provide all labor, materials, and equipment for the campground improvement of 20 sites to 34 sites to include a road modification with curve widening and shaping for drainage and new surfacing. The Host Site and Volunteer Site will be relocated and upgraded with power, water and wastewater vaults. 4 new pre-cast vault toilets will replace the five original 1965 stick-built toilets. The Water system work for this project consists of decommissioning the existing pumphouse, installing a new pre-cast concrete treatment building in a new location, with upgraded plumbing and controls, removing the existing aboveground water storage tank and installing a new below ground fiberglass water storage tank, replacing all the distribution piping and installing new hydrants IAW with SOW, Specifications and Drawings Magnitude of Construction is between $1,000,000 and $5,000,000 NAICS 237110 - Water and Sewer Line and Related Structures Construction
Name: Richard Zacher Address: Comanche Park Campground is located 6.5 miles west of Custer, SD on US16
April 17, 2026, 9:00 AM Mountain Telephone: 605-673-9222 Email: richard.zacher@usda.gov
Background The Comanche Park Campground Reconstruction project is issued by the USDA Forest Service, specifically for the Black Hills National Forest. The mission of this project is to enhance the campground facilities from 20 sites to 34 sites, improving visitor experience and infrastructure. The goal is to provide necessary upgrades including road modifications and utility installations. Work Details The contractor will provide all labor, materials, and equipment for the campground improvement which includes: - Expanding the campground from 20 sites to 34 sites. - Modifying the road with curve widening and shaping for drainage and new surfacing. - Relocating and upgrading the Host Site and Volunteer Site with power, water, and wastewater vaults. - Replacing five original 1965 stick-built toilets with four new pre-cast vault toilets. - Decommissioning the existing pumphouse and installing a new pre-cast concrete treatment building in a new location with upgraded plumbing and controls. - Removing the existing aboveground water storage tank and installing a new below-ground fiberglass water storage tank. - Replacing all distribution piping and installing new hydrants in accordance with the Statement of Work (SOW), specifications, and drawings. Period of Performance The estimated period of performance for this contract is 392 days from the Notice to Proceed (NTP). Place of Performance The construction projects will be performed at Comanche Park Campground, located 6.5 miles west of Custer, SD on US16.
| Contact name | Erick Plamann |
|---|---|
| Contact email | erick.plamann@usda.gov |
| Contact phone | None |
| Secondary contact name | Lucas Dahlman |
| Secondary contact email | lucas.dahlman@usda.gov |
| Secondary contact phone | None |
Agency: Department of Energy
Location: South Dakota
NAICS: 332510
Agency: Indian Health Service
Location: South Dakota
NAICS: 333914
Agency: City of Sioux Falls [SD]
Location: South Dakota
NAICS: Not Provided
Agency: City of Sioux Falls [SD]
Location: South Dakota
NAICS: Not Provided