Control Tower Chamber Equipment Painting, Colebrook River Lake, Colebrook, CT

Project ID: W912WJ26QA081 FederalOpportunitiesSolicitation
Overview
AgencyUSACE New England District
Deadline04/27/26
Posted04/24/26
Estimated Value$100,000 - $250,000 (value based on agency estimated range)
Set AsideSBA
NAICS238320 - Painting and Wall Covering Contractors
PSCY1QA - Construction Of Restoration Of Real Property (Public Or Private)
LocationColebrook River Lake Colebrook, CT USA
Description
Primary Latest Change

THE WORK CONSISTS OF

The work of this project consists of preparation and painting various mechanical equipment items and related items in the gate chamber at Colebrook River Lake in Colebrook, Connecticut. Items to be prepared and painted are steel and include the bonnets, hydraulic piping, hydraulic cylinders, plumbing associated with the two sump pumps (not the sump pumps), the conduit pressure balancing pipe, the vertical float well pipe, air shafts, and one spiral staircase. The entire spiral staircase shall be painted including the portion outside of the gate chamber. Items not specifically included in the list above shall not be prepared and painted, The existing paint coatings on these items have partially failed, and there are areas of peeling, blistering, and rust. The magnitude of construction is between $100,000 and $250,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil) This procurement is set-aside for small business vendors. The applicable NAICS code is 238320 with a Small Business Size Standard of $19 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.

Summary (Newest Update)

Background The project is issued by the U.S. Army Corps of Engineers and focuses on the preparation and painting of various mechanical equipment items located in the gate chamber at Colebrook River Lake in Colebrook, Connecticut. The goal of this contract is to restore the functionality and appearance of the equipment, which has suffered from partially failed paint coatings, including issues such as peeling, blistering, and rust. Work Details The contractor shall provide all labor, materials, and equipment necessary for the preparation and painting of the following items: bonnets, hydraulic piping, hydraulic cylinders, plumbing associated with two sump pumps (excluding the sump pumps themselves), conduit pressure balancing pipe, vertical float well pipe, air shafts, and a spiral staircase. The entire spiral staircase must be painted, including areas outside the gate chamber. Items not specifically listed are excluded from this contract. Place of Performance Colebrook River Lake, Colebrook, Connecticut.

Contacts
Contact nameJennifer Samela
Contact emailjennifer.m.samela@usace.army.mil
Contact phone(978) 318-8324
Same Region Opportunities