Combined Project-Billings Cellblock refresh, Bozeman Wall addition, Bozeman Freezer HVAC

Project ID: 47PD5526R0018 FederalOpportunitiesSolicitation
Overview
AgencyPublic Buildings Service
Deadline05/07/26
Posted04/23/26
Estimated ValueNot Provided
Set AsideSBA
NAICS236220 - Commercial and Institutional Building Construction
PSCZ2AA - Repair Or Alteration Of Office Buildings
LocationBozeman, MT 59715 United States
Description
Primary Latest Change

Summary

- Billings USMS - Cellblock Refresh

Stainless Steel Restoration

- Remove scratches from stainless steel benches and walls in: - Contractor/USMS/GSA walk-through required to verify exact damage locations - Painting - Bozeman FSA - Office Build-Out - Build new wall with metal studs - Install door and frame to match existing (type, size, color) - Extend wall to deck above - Install matching baseboard on new wall - Add electrical receptacles if required by code - Repair/replace carpet as needed - Paint entire room with low VOC paint to match existingRepair affected ceiling grid - Relocate fire sprinklers per code - Move HVAC ceiling penetrations as needed - Bozeman FWS - Freezer HVAC - Install heat removal system for ultra-low temperature freezers - Maintain room temperature between 64.4 F to 89.6 F per - equipment specifications

Solution Options

- New exhaust system with fresh air supply duct, OR - Ductless split-system AC unit with fresh air supply - Contractor to investigate and propose solution with pricing

GENERAL REQUIREMENTS

- Provide all labor, materials, equipment, and supervision - Comply with all applicable codes and standards - Submit detailed cost breakdown and proposed solutions - Maintain OSHA and GSA safety standards - Coordinate access during business hours - HSPD-12 badge required

Summary (Newest Update)

Background The General Services Administration (GSA), Region 8, is undertaking a combined project that includes the Billings USMS Cellblock Refresh, Bozeman FSA Office Build-Out, and Bozeman FWS Freezer HVAC. The aim of this contract is to refresh and repaint existing facilities, construct new office spaces, and improve HVAC systems to ensure compliance with operational standards. Work Details 1. Billings USMS - Cellblock Refresh: The contractor will refresh and repaint stainless steel surfaces in the cellblock area. This includes removing scratches from stainless steel benches and walls, with specific locations verified during a contractor/USMS/GSA walk-through. Additionally, doors and doorframes will be repainted as specified. 2. Bozeman FSA - Office Build-Out: Tasks include building a new wall with metal studs to enclose an alcove area for a private office, installing a matching door and frame, extending the wall to the deck above, adding baseboards, relocating fire sprinklers as required by code, moving HVAC penetrations if necessary, painting the entire room with low VOC paint to match existing colors, and repairing or replacing carpet as needed. 3. Bozeman FWS - Freezer HVAC: The contractor will install a heat removal system for ultra-low temperature freezers to maintain room temperatures between 64.4°F to 89.6°F. Options include either a new exhaust system with fresh air supply duct or a ductless split-system AC unit with fresh air supply. The contractor must investigate and propose solutions along with pricing. Period of Performance The contractor must begin work within 5 calendar days of receiving the notice to proceed and complete all tasks within 60 calendar days thereafter. Place of Performance The projects will take place at two locations in Montana: Billings (2601 2nd Ave N) and Bozeman (10 E Babcock St).

Contacts
Contact nameJohn Morelion
Contact emailjohn.morelion@gsa.gov
Contact phone(817) 805-6017
Secondary contact nameHerb Orrell
Secondary contact emailherb.orrell@gsa.gov
Secondary contact phone(801) 822-4274
Same Region Opportunities