| Agency | Surface Forces Logistics Center |
|---|---|
| Deadline | 04/27/26 |
| Posted | 04/16/26 |
| Estimated Value | <$250,000 (solicitation indicates Simplified Acquisition Procedures, which in most cases, applies to contracts expected to be less than $250K in value) |
| Set Aside | SBA |
| NAICS | 336611 - Ship Building and Repairing |
| PSC | J020 - Maint/Repair/Rebuild Of Equipment- Ship And Marine Equipment |
| Location | Alameda, CA 94501 United States |
This is a combined synopsis/solicitation This is a combined synopsis/solicitation for commercial items/services prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. Request for Quotations number is 70Z08526Q024134 and is issued as a request for quotations (RFQ). This announcement constitutes only solicitation; quotations are being requested, and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-65 dated January 29, 2013. The NAICS Code is 336611. The small business size standard is 1250. This is a totally small business set aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. All responses from interested vendors must be received on/before 0800 Pacific Time, April 27, 2026, and will be reviewed by the Government. The United States Coast Guard Surface Force Logistics Center has a requirement for the following: Contractor shall provide parts requested for USCGC Munro Load Bank Testing: SOW for #2 & #3 SSDGs Load Bank Testing USCGC MUNRO (WMSL-755) - This solicitation is to provide: Load bank testing of the #1 & #2 SSDGs for CGC MUNRO - Vendor to Perform work at ships homeport:
1 EAGLE ROAD ALAMEDA, CA 94501 - Security requirements: No special security requirements needed. Vendor will only require base and ship access during POP. - POP: 28APR2026 26MAY2026 - POC:
- (571) 608-4553
- (571) 608-9108
- (808) 373-6155 31100_BEC_0924_418
WORK ITEM 1: Ship Service Diesel Generator, Load testing, perform 1. SCOPE z 1.1 Intent. This work item describes the requirements for the Contractor to perform load testing of designated Ship Service Diesel Generator (i.e., SSDG) listed in Table 1.
CATERPILLAR mODEL NO. DESCRIPTION
3512B No.02 Ship Service Diesel Generator (NSC 009), 1360 KW, 450 Volt AC, 3 Phase, 60 Hz Auxiliary Machinery Room (5-36-01-E) 3512B No.03 Ship Service Diesel Generator (NSC 009), 1360 KW, 450 Volt AC, 3 Phase, 60 Hz
(7-76-5-Q) 1.2 Government-furnished property. None. 2. REFERENCES
Coast Guard Drawing 750-WMSL-501-002, Rev E, Machinery Arrangements (ASC501001) Coast Guard Drawing 418A-WMSL-801-002, Rev A, Booklet of General Plans
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Coast Guard Technical Publication (TP) 7119, Ship Service Diesel Generator - Model 3512B Coast Guard Technical Publication (TP) 7165B, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power Operation, Maintenance & Installation Volume 1 Coast Guard Technical Publication (TP) 7166B, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power Operation, Maintenance & Installation Volume 2 & 4 Coast Guard Technical Publication (TP) 7167, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power Operation, Maintenance & Installation Volume 3
COMDTINST 9077.1 (series) Equipment Lockout-Tags-Plus Instruction MIL-STD-1310, Sep 2009, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. None. 3.1.2 Tech Rep. None. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following: - Piping
3.1.5 Background information. SSDG listed in Table 1 will be modified by the Coast Guard for the following task:
3.1.5.1 After completion of above listed tasks, this Work Item is to be used for the Contractor to perform load testing of designated SSDG listed in Table 1. 3.2 Work location. The concerned work area is listed in Table 1. See the applicable drawings in References in Paragraph 2 for guidance, locations, and details. 3.2.1 Proposed temporary cable routing must be developed using USCG Dwg 418A-WMSL-801-001. Submit a CFR. 3.2.1.1 Temporary load bank cables must be routed from the switchboard to the load bank via a single route, and must not be routed separately by any method which would lead to unbalanced phase cables to transit through hull or bulkhead openings. 3.3 Grounding. The Contractor must ensure conductive surfaces of the load bank enclosure are appropriately bonded and grounded for protection of personnel. 3.4 Contractor Furnished Materials (CFM). The Contractor must furnish materials listed in the Table 2 for load testing of the SSDG listed in Table 1. TABLE 2 CONTRACTOR furnish MATERIALS MATERIALS description
1500 KW, 450 Volt AC, 3 Phase, 60 Hz, Resistive
Approximate length of 300 Feet Cables with ring tongue compression lugs, 6 Paralleled #4/0 copper (single conductor) per phase (18 Total x 300 Feet) and one additional length for the equipment grounding conductor or Six LSTSGU-400
397 West Ave.
(203-705-2100) OR Any Electrical Cable Supplier 3.4.1 The contractor must provide miscellaneous hardware required for electrical installation (i.e. Nylon Stuffing Tubes, Chafing Gear, Box Connectors, Lugs, Fasteners, Wire Nuts, Tapes, Cable ties & Cable Mounting Brackets, etc) of the electrical equipment. 3.5 Load testing. The Contractor must provide labor and crane services as necessary for placing load bank at suitable location (i.e., On the pier or the ship). After completion of load bank testing of SSDG, the Contractor must remove all installed equipment and cables used during testing. 3.5.1 Testing plan. The Contractor must submit a plan for load testing of the SSDG in accordance with TP 7119. 3.5.1.1 The plan must cover the following topics at a minimum: - Steady increase of load in multiple steps up to 100% real power load - No less than 2 hours of continuous testing at 100% load - Simulated start of 450 HP load (assume no more than 200% FLA) - Emergency shutdown procedures - Load bank specification and location - Cable locations for load bank - No-load tests - Data to be collected during tests - All proposed connections, cable and load bank configurations 3.5.1.2 The Contractor must start testing of the SSDG after COR Approval of submitted Test Plan and official acceptance by the Contract Officer (KO). 3.5.2 After placing load bank at suitable location (i.e., On the pier or the ship) the Contractor must install the cables from the load bank to associated SS Switchboard bus bars (i.e. Back side of SS Switchboard No.2S), according to the agreed upon cable routing. CAUTION THE BACK SIDE OF THE SWITCHBOARD SHOULD BE ROPED OFF AS A PERSONNEL EXCLUSION AREA (APPROXIMATELY 10 FOOT RADIUS FROM ANY VISIBLE LIVE BUS 3.5.2.1 The Contractor must route the cables from designated SSDG to load bank through hatches and passageway. The Contractor must run cables in overheads as much as possible to avoid trip hazards. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. SAFETY At any point in the load test or operational testing period if the need presents itself the engine Prime mover may be shut down by the Tech rep with communication to the USCG operational Engineer utilizing the local EOS, E stop or shut down from the switch gear. Any of the three options will automatically open the SSDG buss breaker 3.5.3 After warmup of SSDG until coolant temperature reaching 140 Degree F, the Contractor must perform the load testing of designated SSDG listed in Table 1 at following load condition.
LOAD HOURS
0.5 Hrs 25 % Load 0.5 Hrs 50 % Load 0.5 Hrs 75 % Load 0.5 Hrs 100 % Load 2.0 Hrs
0.5 Hrs - Running no load testing. No load testing will consist of running the engine at idle rpm until the engine coolant temperature reaches 140 deg. F during that warmup time safety testing will be performed for oil pressure, temp warning, emergency shut down conditions, and coolant temp. warning and shutdown. Shipboard alarm verification will be observed at that time as well. 3.5.3.1 Engine parameter readings during the load bank test must be taken every 15 minutes including, but not limited to the bullet points in this paragraph. Submit a CFR. - Engine temp, Coolant temp, oil pressure, boost pressure, intake air temp after the aftercooler, exhaust stack temp, left and right bank exhaust temperatures. - In addition to the generator load test form, a Caterpillar steady state engine performance file shall be recorded on the engine ECM all related available information. - Generator information, voltage reading per phase, amperage readings per phase, HZ, bearing and winding temps. - Pre and post-test PSSRP shall be saved on the ECM to provide verification of all available diagnostic codes and events. - All electronic files and reports must be submitted via CFR. 3.6 Load test documentation. After completion of testing, the Contractor must provide all collected data sheets to the Contracting Officer. 4. NOTES This section is not applicable to this work item.
Background The United States Coast Guard Surface Force Logistics Center has a requirement for load bank testing of the #1 and #2 Ship Service Diesel Generators (SSDGs) for the USCGC Munro (WMSL-755). This solicitation is issued as a request for quotations (RFQ) under Request for Quotations number 70Z08526Q024134. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures. This is a totally small business set aside, and all responsible sources may submit proposals that will be considered by the agency. Work Details The contractor shall perform load bank testing of the #1 and #2 SSDGs located at the CGC Munro's homeport at United States Coast Guard Base Alameda, California. The work includes: 1. Load testing of designated SSDGs as specified in Table 1, which includes two Caterpillar model 3512B generators with specifications of 1360 KW, 450 Volt AC, 3 Phase, 60 Hz. 2. The contractor must handle all interferences such as piping, electrical cables, switchboard enclosures, vent ducting, and motor-operated valves. 3. The contractor must provide all necessary protective measures and ensure grounding of load bank enclosures. 4. The contractor is responsible for furnishing materials required for load testing as listed in Table 2, including a load bank and associated cables. 5. A detailed testing plan must be submitted covering various load conditions and safety procedures during testing. 6. Documentation of engine parameters during tests must be collected and submitted post-testing. Period of Performance The period of performance is from April 28, 2026 to May 26, 2026. Place of Performance The work will be performed at United States Coast Guard Base Alameda, located at 1 Eagle Road, Alameda, CA 94501.
| Contact name | McTague, Sean |
|---|---|
| Contact email | sean.p.mctague@uscg.mil |
| Contact phone | 15716143888 |
| Secondary contact name | ULISES BALMACEDA |
| Secondary contact email | ulises.o.balmaceda@uscg.mil |
| Secondary contact phone | (206) 820-0307 |
Agency: VISN 22: Desert Pacific Healthcare Network
Location: California
NAICS: 339112
Agency: Department of Homeland Security
Location: California
NAICS: 518210
Agency: Naval Information Warfare Systems Command
Location: California
NAICS: 334290
Agency: California Department of State Hospitals [CA]
Location: California
NAICS: Not Provided