Alewife Station Red Line Tunnel Access Point Design and Construction
Agency: Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division [MA]
Location: Massachusetts
NAICS: Not Provided
| Agency | Department of the Air Force |
|---|---|
| Deadline | 05/01/26 |
| Posted | 04/16/26 |
| Estimated Value | Not Provided |
| Set Aside | None |
| NAICS | 541330 - Engineering Services |
| PSC | N016 - Installation Of Equipment- Aircraft Components And Accessories |
| Location | Hanscom AFB, MA United States |
This notice is from the Air Force Life Cycle Management Center (AFLCMC) AWACS and Wedgetail Contracting Office (WIWK) located at 3 Eglin Street, Hanscom Air Force Base, Massachusetts 01731. The previously publicized RSU NOCA, is intended for final FOPR release within Q2 CY2026. The FOPR will only be released on the General Services Administration (GSA) One Acquisition Solution for Integrated Services Plus (OASIS+) within the Technical and Engineering Domain. Interested Bidders should have access to SIPR e-mail in order to received classified Technical Documentation needed for submission of complete proposal. The Government is not requesting any information or proposals in response to this notice. The Government will be holding a Request for Proposal walk-through at a date and time to be set upon release of this solicitation. Bidders interested in attending can look for an announcement on GSA OASIS+. Synopsis: RSU for International AWACS shall include a full upgrade to the Ultra-High Frequency (UHF)/Very-High Frequency (VHF) and High-Frequency (HF) radio suite to a full fleet of aircraft. Integration and installation of the radios will provide the Second Generation Anti-Jam Tactical UHF Radio for North America Treaty Organization (NATO) (SATURN) and Tactical Secure Voice Cryptographic Interoperability Specification (TSVCIS) capabilities for the aircraft.
Background This notice is from the Air Force Life Cycle Management Center (AFLCMC) AWACS and Wedgetail Contracting Office located at Hanscom Air Force Base, Massachusetts. The contract aims to upgrade the radio systems for the International Airborne Advance Warning and Control System (AWACS) to enhance communication capabilities for NATO operations. The final Request for Proposal (FOPR) is expected to be released in Q2 CY2026 on the GSA OASIS+ platform. Work Details The Radio System Upgrade (RSU) for International AWACS will include a comprehensive upgrade of the Ultra-High Frequency (UHF), Very-High Frequency (VHF), and High-Frequency (HF) radio suite across a full fleet of aircraft. Key tasks include: 1. Integration and installation of the upgraded radios. 2. Provision of Second Generation Anti-Jam Tactical UHF Radio for NATO (SATURN). 3. Implementation of Tactical Secure Voice Cryptographic Interoperability Specification (TSVCIS) capabilities. Place of Performance The work will be conducted at locations associated with the Air Force Life Cycle Management Center, primarily at Hanscom Air Force Base, Massachusetts.
| Contact name | Brett Clemens |
|---|---|
| Contact email | brett.clemens.1@us.af.mil |
| Contact phone | (781) 225-5722 |
| Secondary contact name | Allison Eacrett |
| Secondary contact email | allison.eacrett@us.af.mil |
| Secondary contact phone | None |
Agency: Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division [MA]
Location: Massachusetts
NAICS: Not Provided
Agency: USGS Office of Acquisitions and Grants
Location: Massachusetts
NAICS: 324110
Agency: Department of the Army
Location: Massachusetts
NAICS: 236220
Agency: ACC Aberdeen Proving Ground
Location: Massachusetts
NAICS: 332439