AK USFS Chug1004 9(1), Vagt Lake Trailhead

Project ID: 69056724B000024 FederalOpportunitiesPresolicitation
Overview
AgencyWestern Federal Lands Highway Division
DeadlineNone
Posted04/07/26
Estimated Value$700,000 - $2,000,000 (AI estimate)
Set AsideSBA
NAICS237310 - Highway, Street, and Bridge Construction
PSCY1LB - Construction Of Highways, Roads, Streets, Bridges, And Railways
LocationSeward, AK United States
Description
Primary Latest Change

Posted: Aug. 29, 2024, 3:08 p.m. EDT

Summary (Newest Update)

Background The project is issued by the U.S. Forest Service (USFS) and is located in the Chugach National Forest, specifically at Vagt Lake Trailhead, 25 miles north of Seward, Alaska. The mission of the USFS includes managing national forests and grasslands for multiple uses while ensuring sustainable practices. The goal of this contract is to enhance public access and facilities at the Vagt Lake Trailhead through various construction tasks. Work Details The work consists of excavation, grading involving placement of Unclassified Borrow and Aggregate, vault toilet installation, concrete placement for ADA parking spaces and walkways, and sign installation. Specific tasks include: - Construction Survey & Staking - Contractor Quality Control and Assurance - Soil Erosion Control measures including silt fence and fiber rolls - Clearing & Grubbing over 3 acres - Roadway Excavation totaling 140 cubic yards - Placement of 10,500 cubic yards of Unclassified Borrow - Installation of 120 boulders for slope reinforcement - Minor concrete pavement installation with a depth of 6 inches over 280 square yards - Installation of various signs including directional signs and accessibility symbols. Period of Performance The contract is anticipated to be completed by Fall 2025. Place of Performance Lower Trail Lake in Crown Point, Kenai Peninsula Borough, Alaska.

Current: Posted: April 7, 2026, 2:33 p.m. EDT PROJECT: AK USFS Chug1004 9(1), Vagt Lake Trailhead LOCATION: The project is located 25 miles north of Seward, Alaska in the Kenai Peninsula Borough at the Lower Trail Lake in Crown Point. WORK: The work consists of excavation, grading (involving placement of Unclassified Borrow and Aggregate), vault toilet installation, concrete placement for ADA parking spaces and walkways, and sign installation. See Project Description posted under attachments for additional details. LENGTH: 0.13 miles TENTATIVE COMPLETION DATE: This project is on hold with no estimated construction dates. CONTRACT TYPE: Sealed Bid, Firm-Fixed-Price Contract ESTIMATED PRICE RANGE: Between $700,000 and $2,000,000. INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220. THIS SOLICITATION IS OFFERED AS A SMALL BUSINESS SET-ASIDE. This project is on hold with no estimated solicitation dates. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the follow button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link.
Contacts
Contact nameContracts G. Office
Contact emailwfl.contracts@dot.gov
Contact phone(360) 619-7520
Same Region Opportunities