IL4 Storage & Wireless
Agency: Air Combat Command
Location: Nevada
NAICS: 541519
| Agency | Boulder City [NV] |
|---|---|
| Deadline | 04/16/26 |
| Posted | 04/06/26 |
| Estimated Value | $2,000,000 - $5,000,000 (AI estimate) |
| Set Aside | Not Provided |
| NAICS | Not Provided |
| PSC | Not Provided |
| Location | Nevada |
This work shall include furnishing all labor, material and equipment to complete the project ADAMS BOULEVARD REHABILITATION, COTTONWOOD STREET TO AVENUE G as described in the specifications and shown in the plans. The work also includes improvements on Avenue B from Adams Boulevard to 5th Street. Work includes asphalt milling, pulverizing portions of existing asphalt and base material, base preparation, paving, ADA ramp upgrades, sidewalk, driveway, cross gutter, and curb & gutter removal and replacement, traffic striping, and adjusting utilities to grade. Work shall also include crack sealing and Type I slurry seal application to the staging area, Whalen Field Parking Lot, at the conclusion of using the staging area.
Background The City of Boulder City, Nevada, is issuing a contract for the Adams Boulevard Rehabilitation project. This project aims to enhance the infrastructure along Adams Boulevard from Cottonwood Street to Avenue G. It is part of the city's efforts to improve transportation and accessibility in the area, including necessary upgrades to sidewalks and ADA ramps. The project is funded by the City of Boulder City and the Regional Transportation Commission of Southern Nevada. Work Details The contractor will provide all labor, materials, and equipment necessary to complete the following tasks: - Asphalt milling - Pulverizing existing asphalt and base material - Base preparation - Paving - Upgrading ADA ramps - Removing and replacing sidewalks, driveways, cross gutters, and curb & gutter - Traffic striping - Adjusting utilities to grade - Crack sealing - Applying Type I slurry seal to the staging area at Whalen Field Parking Lot after its use. Additionally, improvements will be made on Avenue B from Adams Boulevard to 5th Street. Period of Performance The work is scheduled to begin no later than May 26, 2026, with a completion deadline of August 7, 2026. The total duration for completion is set at 73 calendar days. Place of Performance The work will be performed within the city limits of Boulder City, Nevada, specifically along Adams Boulevard from Cottonwood Street to Avenue G. Bidder Requirements Bidders must hold a valid Nevada contractor's license corresponding to the work performed. They are required to submit proof of payment of sales and use taxes or motor vehicle privilege taxes as per NRS 338.147. Additionally, bidders must demonstrate that at least 25% of the work will be performed without subcontracting.
| Contact name | Paul Sikora |
|---|---|
| Contact email | psikora@bcnv.org |
| Contact phone | (702) 293-9246 |
Agency: Air Combat Command
Location: Nevada
NAICS: 541519
Agency: Nevada Public Works [NV]
Location: Nevada
NAICS: Not Provided
Agency: Air Combat Command
Location: Nevada
NAICS: 336999
Agency: NPS Pacific West Region
Location: Nevada
NAICS: 561730