Potable Water Testing Services, Buffumville Lake, Charlton, MA

Project ID: W912WJ26QA072 FederalOpportunitiesSolicitation
Overview
AgencyUSACE New England District
Deadline03/27/26
Posted03/16/26
Estimated Value$5,000 - $20,000 (AI estimate)
Set AsideSmall Business
NAICS541380 - Testing Laboratories and Services
PSCF103 - Environmental Systems Protection- Water Quality Support
LocationCharlton, MA United States
Description
Primary Latest Change

Summary

The U.S. Army Corps of Engineers - New England District is issuing a Solicitation Notice for Potable Water Testing Services, Buffumville Lake, Charlton, MA.

THE WORK CONSISTS OF

Contractor shall provide all labor, materials, equipment, and transportation necessary to sample and test potable water at Buffumville Lake Park. All procedures will be in accordance with 310 CMR 22.00: The Massachusetts Drinking Water Regulations. The Contractor shall be the primary communicator between the Government and the Massachusetts Department of Environmental Protection (Mass DEP). The Contractor shall complete and submit all required documents and forms to allow for the public water supply to operate in accordance with the Mass DEP. This procurement is set-aside for small business vendors. The applicable NAICS code is 541380 with a Small Business Size Standard of $19 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.

Summary (Newest Update)

Background The U.S. Army Corps of Engineers - New England District is issuing a solicitation for Potable Water Testing Services at Buffumville Lake Park in Charlton, MA. The mission of the Corps is to manage and protect the nation's water resources. This contract aims to ensure compliance with Massachusetts Drinking Water Regulations (310 CMR 22.00) for the public water supply at the park. Work Details The contractor shall provide all labor, materials, equipment, and transportation necessary to sample and test potable water at Buffumville Lake Park. Key tasks include: 1. Seasonal Start-up Procedures: Submit a written sampling plan and start-up procedure to Mass DEP by May 1st. 2. Routine Water Testing: Conduct tests at specified intervals from three sampling points and submit results within 48 hours. 3. Additional Testing: Perform up to two additional tests if routine tests exceed Maximum Contaminant Levels (MCL). 4. Corrective Action Treatment: Provide treatment if any test exceeds MCL or as requested by Mass DEP, with up to four instances allowed. 5. Seasonal Shutdown Procedures: Complete seasonal shutdown paperwork without responsibility for winterizing the system. Period of Performance The base year of performance is from April 1, 2026, or contract award if after that date, until March 31, 2027. There are options for two additional years. Place of Performance Buffumville Lake Park, located at 229 Oxford Rd., Charlton, MA 01507.

Contacts
Contact nameAlicia LaCrosse
Contact emailalicia.n.lacrosse@usace.army.mil
Contact phone(978) 318-8902
Same Region Opportunities