River Birch Road Asphalt Paving

Project ID: W912EK26QA015 FederalOpportunitiesSolicitation
Overview
AgencyUSACE Rock Island District
Deadline03/27/26
Posted03/13/26
Estimated Value$250,000 - $600,000 (AI estimate)
Set AsideSmall Business
NAICS237990 - Other Heavy and Civil Engineering Construction
PSCY1NE - Construction Of Water Supply Facilities
LocationThomson, IL 61285 United States
Description
Primary Latest Change

The United States Army Corps of Engineers (USACE) - Rock Island District has a service requirement to cinduct the milling of existing asphalt pavement, the stockpiling of millings, and the placement of hot mix asphalt pavement and tack coat for the repaving of River Birch Road to the River Birch Campground at the USACE Thomson Causeway Recreation Area. See Solicitation, Specifications, and Quality Assurance Surveillance Plan for additional information on requirement. Quotes are due via email to Contract Specialist Carrie Holub, Email: carrie.l.holub@usace.army.mil by 27 March 2026 at 2PM Central Time.

Summary (Newest Update)

Background The United States Army Corps of Engineers (USACE), Rock Island District, is seeking a contractor to perform essential road maintenance services at the Thomson Causeway Recreation Area. The goal of this contract is to repave River Birch Road leading to the River Birch Campground, ensuring safe and accessible routes for visitors. This project aligns with USACE's mission to maintain and improve recreational facilities for public use. Work Details The scope of work includes: milling approximately 4 inches of existing asphalt pavement, stockpiling the millings, stripping sod and topsoil, excavating subgrade, placing and compacting asphalt millings, placing and compacting aggregate base, constructing aggregate shoulders, placing riprap, and applying Hot Mix Asphalt (HMA) pavement along with tack coat. Specific tasks include: 1) Milling existing asphalt pavement and stockpiling millings; 2) Applying tack coat to the prepared aggregate base; 3) Placing and compacting a 2.5-inch HMA binder course; 4) Conducting density tests on the HMA binder course; 5) Applying tack coat before placing a 1.5-inch HMA surface course; 6) Performing site restoration by cleaning up debris from the project area. Period of Performance The total duration of the contract is 60 calendar days. Key milestones include completing milling and stockpiling within 14 days from the Notice to Proceed or favorable weather conditions, followed by placement of HMA pavement within 21 days after government notification. All work must be completed by May 1st, 2026. Place of Performance The construction projects will be performed at the USACE Thomson Causeway Recreation Area located at 100 Lewis Avenue, Thomson, IL 61285.

Contacts
Contact nameCarrie Holub
Contact emailcarrie.l.holub@usace.army.mil
Contact phone(309) 794-5667