Disater Debris Removal
Agency: Beauregard Parish Police Jury [LA]
Location: Louisiana
NAICS: Not Provided
| Agency | USFS Region 9: Eastern Region |
|---|---|
| Deadline | 04/30/26 |
| Posted | 03/04/26 |
| Estimated Value | $2,000,000 - $3,000,000 (value based on agency estimated range) |
| Set Aside | Small Business |
| NAICS | 237310 - Highway, Street, and Bridge Construction |
| PSC | Z2LB - Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways |
| Location | Elmer, LA 71424 United States |
NFSR 205 Pavement Reconstruction LOUISIANA
The project is set-aside 100% for small businesses per FAR 19.5.
237310 - Highway, Street, and Bridge Construction (size standard $45m). PSC: Z2LB - Repair Of Highways, Roads, Streets, Bridges, And Railways. Magnitude: Between $2,000,000 and $3,000,000.
Kincaid Recreation Area, Calcasieu Ranger District, Kisatchie National Forest, (Rapides Parish, LA). See Attachment 003 Statement of Work for specific location. Scope of Work (summarized): See Attachment 003 Statement of Work for specific details not included under this paragraph. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project. Project includes removal of failed materials, base stabilization, resurfacing, compaction and finishing to restore NFSR 205 Roadway to its original condition.
A single award will be made to the overall lowest priced responsive/responsible bidder.
Site(s) Visit/Pre-Bid Conference (if needed): 03/25/2026 - POC Robert Wilson robert.wilson3@usda.gov
04/20/2026.
04/30/2026, 1300 CT. - NOTE: Bid Bond is required Delivery: 120 Days After Notice to Proceed
120 Days After Notice to Proceed
All proposals will be emailed to adam.doyle@usda.gov and cc steven.alves@usda.gov You may email to confirm receipt.
Background The NFSR 205 Pavement Reconstruction project is issued by the USDA Forest Service, specifically for the Kincaid Recreation Area located in the Calcasieu Ranger District of Kisatchie National Forest, Rapides Parish, Louisiana. The project aims to rehabilitate the NFSR 205 roadway to restore it to its original condition, which aligns with the agency's mission to maintain and improve forest infrastructure for public use. Work Details The contractor is responsible for supplying all necessary materials, labor, tools, equipment, supplies, incidentals, supervision, and safety measures required to complete the project. Key tasks include: removal of failed materials; base stabilization; resurfacing; compaction; and finishing of the roadway. The project also involves specific construction tasks such as full depth reclamation with cement, installation of rubber wheel stops, thermoplastic markings including arrows and stop bars, and chip sealing. The magnitude of construction is estimated between $2 million and $3 million. Period of Performance The contract will be performed over a period of 120 days after the notice to proceed is issued. Place of Performance Kincaid Recreation Area, Calcasieu Ranger District, Kisatchie National Forest, Rapides Parish, Louisiana.
| Contact name | Adam Doyle |
|---|---|
| Contact email | adam.doyle@usda.gov |
| Contact phone | (573) 917-0857 |
| Secondary contact name | Steven J Alves |
| Secondary contact email | steven.alves@usda.gov |
| Secondary contact phone | (859) 745-3131 |
Agency: Beauregard Parish Police Jury [LA]
Location: Louisiana
NAICS: Not Provided
Agency: Beauregard Parish Police Jury [LA]
Location: Louisiana
NAICS: Not Provided
Agency: Global Strike Command
Location: Louisiana
NAICS: 488190
Agency: USACE New Orleans District
Location: Louisiana
NAICS: 237990