Repair & Maintain Airfield Stormwater System Phase II

Project ID: FGWB210002AB FederalOpportunitiesPresolicitation
Overview
AgencyReserve Command
DeadlineNone
Posted03/03/26
Estimated ValueNot Provided
Set AsideSmall Business
NAICS237110 - Water and Sewer Line and Related Structures Construction
PSCZ2NZ - Repair Or Alteration Of Other Utilities
LocationMarietta, GA 30069 United States
Description
Primary Latest Change

While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.

Summary (Newest Update)

Background The Department of the Air Force, specifically the Air Force Reserve Command, 94th Contracting Flight, is issuing a requirement to repair and maintain the Airfield Stormwater System Phase II, Project FGWB 21-0002 A/B at Dobbins Air Reserve Base (ARB), Georgia. The goal of this contract is to ensure proper drainage and prevent erosion on the airfield, which is critical for operational safety and efficiency. Work Details The project involves repairing stormwater drainage systems located east of Taxiway 'J' on Dobbins ARB. Key tasks include: - Regrading areas where slopes have failed or been disturbed from previous repairs. - Applying sod for stabilization and positive drainage. - Performing maintenance on identified items in basins III, IV, and V on the airfield. - Cleaning existing flumes, pipes, and swales to restore proper drainage patterns. - Installing new concrete flumes at various locations throughout the airfield to ensure positive drainage and prevent future erosion and standing water. Period of Performance 420 Calendar Days Place of Performance Dobbins Air Reserve Base, Georgia

Contacts
Contact nameKevin Song
Contact emailkevin.song@us.af.mil
Contact phone(678) 655-3695
Secondary contact nameKenneth Jacob
Secondary contact emailkenneth.jacob.1@us.af.mil
Secondary contact phone(678) 655-5745
Same Region Opportunities