437-24-101, Replace UST's & Leak Detection System
Agency: VISN 23: Midwest Health Care Network
Location: Fargo, Cass, North Dakota
NAICS: 236220
| Agency | VISN 23: Midwest Health Care Network |
|---|---|
| Deadline | 03/31/26 |
| Posted | 03/02/26 |
| Estimated Value | $3,500,000 - $6,000,000 (AI estimate) |
| Set Aside | SDVOSB |
| NAICS | 236220 - Commercial and Institutional Building Construction |
| PSC | Y1DZ - Construction Of Other Hospital Buildings |
| Location | Fargo, ND 58102 United States |
The Contractor shall furnish all labor, materials, and equipment to replace existing UST's (Underground Storage Tank) #1, #2, #3, #4, #8, existing AST's (Aboveground Storage Tank) #4, and #5, along with existing #1, #2, #3, #4, #8, #9 and #10 UST interconnected below-grade piping systems on the Fargo VA campus including designing flexible spill containment liners, tertiary containment barriers, encasement barriers, waterproof manway covers, and Auto Tank Gauges (ATG) with integrated monitoring and reporting. Environmental assessments, soil boring tests and geotechnical drilling at four VA site locations required, along with compliance with physical security and resiliency standards for intrusion and blast protection. A phasing plan to ensure zero downtime for existing backup generators with temporary power solutions shall be proposed & followed. Additional work includes cathodic protection system design, semiautomatic pump clarification systems, and establish control points for future construction POP: 540 days.
Background The Department of Veterans Affairs is issuing this solicitation for the replacement of Underground Storage Tanks (USTs) and Aboveground Storage Tanks (ASTs) on the Fargo VA campus. The project aims to enhance environmental safety and compliance with physical security standards, ensuring that the facilities meet modern operational requirements. This contract is set aside for Service Disabled Veteran Owned Small Business (SDVOSB) concerns, in accordance with Public Law 109-461 and the Veterans First Contracting Program. Work Details The contractor shall furnish all labor, materials, and equipment necessary to replace existing USTs #1, #2, #3, #4, #8 and ASTs #4 and #5. This includes the removal and replacement of interconnected below-grade piping systems for USTs #1, #2, #3, #4, #8, #9, and #10. The scope of work also involves designing flexible spill containment liners, tertiary containment barriers, encasement barriers, waterproof manway covers, and Auto Tank Gauges (ATG) with integrated monitoring and reporting capabilities. Environmental assessments including soil boring tests and geotechnical drilling at four VA site locations are required. Compliance with physical security standards for intrusion and blast protection must be ensured. A phasing plan to maintain zero downtime for existing backup generators with temporary power solutions must be proposed and followed. Additional tasks include designing a cathodic protection system and semi-automatic pump clarification systems. Period of Performance 540 days from the notice to proceed. Place of Performance Fargo VA campus.
| Contact name | Benjamin Woehrle |
|---|---|
| Contact email | benjamin.woehrle@va.gov |
| Contact phone | (651) 293-3071 |
Agency: VISN 23: Midwest Health Care Network
Location: Fargo, Cass, North Dakota
NAICS: 236220
Agency: VISN 23: Midwest Health Care Network
Location: Fargo, Cass, North Dakota
NAICS: 238210
Agency: Agricultural Research Service
Location: Fargo, Cass, North Dakota
NAICS: Not Provided
Agency: VISN 23: Midwest Health Care Network
Location: Fargo, Cass, North Dakota
NAICS: 334510