Sources Sought for WWYK200131 - Repair Chilled Water System, Bldg. 2280

Project ID: FA813726R0010 FederalOpportunitiesSources Sought
Overview
AgencyDepartment of the Air Force
Deadline03/13/26
Posted02/26/26
Estimated ValueNot Provided
Set AsideSmall Business
NAICS236220 - Commercial and Institutional Building Construction
PSCZ1AA - Maintenance Of Office Buildings
LocationTinker AFB, OK 73145 United States
Description
Primary Latest Change

The work to be performed under the terms of this contract consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the chilled water system at B2280 at Tinker Air Force Base (AFB), Oklahoma (project drawings can be provided to interested vendors for additional location and schematic information). Contact the primary or secondary point of contact to request project drawings. This is a construction-only contract. The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government. Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor. This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps or in aircraft hangers or maintenance areas. Thus, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (TinkerAFBI) 21-100. IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI to reside on or transit through contractor and/or subcontractor systems.

Summary (Newest Update)

Background The work to be performed under this contract consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the chilled water system at B2280 at Tinker Air Force Base (AFB), Oklahoma. The goal of this contract is to ensure a complete, fully operating, and functioning chilled water system ready for use by the Government. The contractor will be responsible for identifying necessary logistical, architectural, and structural work elements required for the project. Work Details The contractor shall perform a site investigation to verify existing conditions. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings or specifications shall be provided by the Contractor as required. The project includes: 1. Repair of the chilled water system at B2280. 2. Site investigation and verification of existing conditions. 3. Provision of all necessary materials and labor for completion. 4. Compliance with safety training requirements for personnel working in operational areas. 5. Adherence to quality control measures as outlined in specification section 01 45 00.00 10. Place of Performance Tinker Air Force Base (AFB), Oklahoma.

Contacts
Contact nameSharla Flowers
Contact emailsharla.flowers_brandon.1@us.af.mil
Contact phoneNone
Secondary contact nameMichael Johnson
Secondary contact emailmichael.johnson.404@us.af.mil
Secondary contact phone(405) 620-2913
Same Region Opportunities