EU199 Emission Control Upgrades Project GC/CM

Project ID: 2B-2026 Pre Construction State|LocalOpportunities
Overview
AgencyCity of Bellingham [WA]
Deadline12/31/99
Posted02/25/26
Estimated Value$5,000,000 - $15,000,000 (AI estimate)
Set AsideNot Provided
NAICSNot Provided
PSCNot Provided
LocationWashington
Description
Primary Latest Change

The City of Bellingham is undertaking the Incinerator Emission Control Upgrades Project at the Post Point Wastewater Treatment Plant, aimed at modernizing air pollution control equipment to meet federal emission standards. As part of our preparation, we are seeking construction market input prior to initiating a formal General Contractor/Construction Manager (GC/CM) procurement for this critical project.The City has retained Brown and Caldwell (BC) to provide Owners Advisor services for the GC/CM procurement process. We would like to invite interested firms to participate in a market sounding activity with BC. This is an opportunity to share your perspective on project goals, procurement approach, and other key considerations. Participation will involve a virtual discussion, with summary feedback anonymized by BC and shared with the City. Participation is not required and will not impact eligibility for the upcoming procurement.

Summary (Newest Update)

Background The City of Bellingham is initiating the Incinerator Emission Control Upgrades Project at the Post Point Wastewater Treatment Plant (PPWWTP) to modernize air pollution control equipment in compliance with federal emission standards. The project aims to enhance environmental stewardship and public health protection while ensuring safe and compliant operations at the facility. Brown and Caldwell (BC) has been engaged as the Owner's Advisor for the General Contractor/Construction Manager (GC/CM) procurement process, facilitating market input prior to formal procurement. Work Details The project involves upgrading the air pollution control (APC) equipment for two multiple hearth incinerators at PPWWTP. Key upgrades include: - Installing a new wet scrubber - Wet electrostatic precipitator - Regenerative thermal oxidizer - Selective catalytic reduction system - Mercury control unit Additionally, a new APC equipment building approximately 5,000 square feet will be constructed to house this equipment along with an electrical room and incinerator control room. The design will utilize performance-based specifications to ensure compliance with emission standards outlined in Title 40 Code of Federal Regulations Part 60, Subpart LLLL. Period of Performance The project is scheduled to begin with preliminary design completion in March 2026, followed by substantial completion anticipated by June 2031. Place of Performance The contract work will be performed at the Post Point Wastewater Treatment Plant located in Bellingham, Washington. Bidder Requirements Bidders must demonstrate relevant experience in GC/CM delivery on projects involving continuous operations at critical facilities. Proposals must include project team structure, key personnel qualifications, resource availability, financial capacity, and proof of insurance and bonding capacity.