Intrusion Detection Update (Hill 24789)

Project ID: FA8222-26-Q-NESP FederalOpportunitiesSolicitation
Overview
AgencyAir Force Sustainment Center
Deadline02/20/26
Posted02/09/26
Estimated Value$120,000 - $180,000 (AI estimate)
Set AsideNone
NAICS238210 - Electrical Contractors and Other Wiring Installation Contractors
PSCN059 - Installation Of Equipment- Electrical And Electronic Equipment Components
LocationHill Air Force Base, UT 84056 United States
Description
Primary Latest Change

Summary

The 309 Software Engineering Group's (SWEG) 555 Software Engineering Squadron (SWES)/MXDPDB needs to replace the Intrusion Detection System (IDS) in Building 2721, Bay D. The Bay is scheduled for Classified use starting February 2026. The current IDS system does not adhere to the mandatory standards set by the Intelligence Community Directive (ICD) for use as a Classified Processing Area (CPA). The current hardware needs to be removed and approved hardware installed before Bay D can be used as a CPA. The items needed are as follows:

1) Manufacturer

Honeywell Description: V5 Vindicator IDS Qty: 1

2) Manufacturer

Optex Description: Ceiling Mounted Motion Sensors Qty: 28

3) Manufacturer

Magnasphere Description: Battery Management System (BMS) Sensors Qty: 8 The Base Defense Operations Center (BDOC) has approved the following hardware for new procurements, installs, and upgrades:

Magnasphere HSS-L2S-000 BMS

The Base Defense Operations Center (BDOC) supplies a Non-Nuclear Configuration Management Database (CMD) Equipment Approval list which must be used for purchasing items for use in PL-1 (non-nuclear) through PL-4 applications and configurations on Hill Air Force Base. The CMD list only approves Honeywell's CUI V5 vindicator. To keep Bay D in compliance with ICD standards, alternative hardware or manufacturers will not be permitted. Honeywell discontinued production of the V5 vindicator in December 2023 and is no longer sold or supported by Honeywell. Because of this, any remaining V5s are in high demand and are in low supply. Honeywell replaced the V5 vindicator with the V6 vindicator in June 2024, however BDOC has not approved the V6 for use. It is not known which brand of vindicators BDOC will approve for future use at Hill AFB or when they will be approved. SDS Construction is the only base approved contractor who has the V5 in stock. It is doubtful other base approved contractors will be able to obtain a V5 within the 60-day delivery time frame with the V5 being discontinued two years ago. For this reason, SDS Construction has been selected for this purchase request. SDS Construction can also supply the other items required to update Bay D into a CPA within the 60-day delivery time frame.

Period of Performance

60 Days After Receipt of Order (ARO).

Summary (Newest Update)

Background The 309 Software Engineering Group's (SWEG) 555 Software Engineering Squadron (SWES)/MXDPDB is seeking to replace the Intrusion Detection System (IDS) in Building 2721, Bay D, which is scheduled for Classified use starting February 2026. The current IDS does not comply with the mandatory standards set by the Intelligence Community Directive (ICD) for a Classified Processing Area (CPA). The goal of this contract is to remove the existing hardware and install approved hardware to ensure compliance with these standards. Work Details The scope of work includes: removal of previously installed IDS hardware and installation of new IDS hardware. The contractor must ensure that the IDS system for Bay D meets CPA standards and can be monitored by base security forces. Specific requirements include: - Removal of current IDS equipment and installation of new hardware from the Configuration Management Database (CMD) Equipment Approval List. - Purchase and installation of the following items: 1) Honeywell V5 Vindicator IDS - Qty: 1 2) Optex Ceiling Mounted Motion Sensors - Qty: 28 3) Magnasphere Battery Management System (BMS) Sensors - Qty: 8 - Delivery of all hardware at least three days prior to installation. - Provision of design drawings for the IDS systems to the Government Point of Contact (GPOC) within 14 calendar days after contract award. - Installation must follow manufacturer guidelines, ensuring all components connect properly to door hardware where applicable. The contractor is responsible for modifications needed for proper installation, including door penetrations and additional conduit. Period of Performance 60 Days After Receipt of Order (ARO) Place of Performance 7750 Georgia Street, Bldg 2721, Bay D, Hill AFB, UT 84056

Contacts
Contact namejonathan Graham
Contact emailjonathan.graham.11@us.af.mil
Contact phone(801) 586-3365
Same Region Opportunities

Spectrum Analyzer

Agency: Air Force Materiel Command

Location: Hill Air Force Base, Utah

NAICS: 334515