A250 Emergency Repairs to Pier 1

Project ID: 140P4326R0001 FederalOpportunitiesSolicitation
Overview
AgencyNPS Northeast Region
Deadline02/26/26
Posted02/09/26
Estimated Value$1,000,000 - $5,000,000 (value based on agency estimated range)
Set AsideSmall Business
NAICS237990 - Other Heavy and Civil Engineering Construction
PSCZ1PZ - Maintenance Of Other Non-Building Facilities
Location21 Second Ave Charlestown, MA 02129 United States
Description
Primary Latest Change

The National Park Service, Northeast Region, New England Major Acquisition Buying Office, issues this Request for Proposal (RFP) for a construction requirement at Pier 1 within the Charlestown Navy Yard of Boston National Historic Park, Boston, Massachusetts. The Work consists of repairs of concrete encased steel beams within three (3) pier vaults, repairs of sinkholes within the topside of the pier deck, repair of concrete delamination of the pier underdeck, repairs of the existing steel barge, and repair to the connection between an aluminum gangway and concrete deck platform. Detailed Specifications and Drawings are provided with the solicitation documents. The estimated magnitude of the complete requirement is between $1,000,000 and $5,000,000. The site visit will be held on Thursday February 12, 2026, at 11:00am EST. All interested parties shall meet at Boston National Historical Park, in front of the USS Constitution Museum, adjacent to Dry Dock 1 in the Charlestown Navy Yard, Charlestown, MA. Parking is not available within Boston National Historical Park. Provisions and clauses - Attachment 1 - PMIS 350460 - Pier 1 SOW Attachment 2 - PMIS 350460 - Pier 1 Drawings Attachment 3 - Department of Labor (DOL) Wage Determination Attachment 4 - Construction Contract Administration Provision Attachment 5 - Limitation on Subcontracting Report Attachment 6 - Past Performance Questionnaire

Summary (Newest Update)

Background The National Park Service (NPS), Northeast Region, New England Major Acquisition Buying Office, is issuing this Request for Proposal (RFP) for construction work at Pier 1 within the Charlestown Navy Yard of Boston National Historic Park, located in Boston, Massachusetts. The goal of this contract is to perform essential repairs to ensure the structural integrity and safety of the pier facilities, which are part of a historic site managed by the NPS. Work Details The work under this contract includes: 1. Repairs of concrete encased steel beams within three pier vaults. 2. Remediation of sinkholes on the topside of the pier deck. 3. Repair of concrete delamination on the pier underdeck. 4. Repairs to the existing steel barge. 5. Repair to the connection between an aluminum gangway and a concrete deck platform. Detailed specifications and drawings are provided with the solicitation documents. Period of Performance The contract performance period is from March 16, 2026, to June 12, 2026. Place of Performance The construction projects will be performed at Pier 1 within the Charlestown Navy Yard of Boston National Historic Park, Boston, Massachusetts.

Contacts
Contact nameTolleson, Mari
Contact emailmari_tolleson@nps.gov
Contact phone(857) 283-4598
Same Region Opportunities