FY26 Duluth Superior Harbor Maintenance Dredging

Project ID: W911XK26BA018 FederalOpportunitiesSolicitation
Overview
AgencyUSACE Detroit District
Deadline03/04/26
Posted02/04/26
Estimated Value$2,500,000 - $6,000,000 (AI estimate)
Set AsideNone
NAICS237990 - Other Heavy and Civil Engineering Construction
PSCY1KF - Construction Of Dredging Facilities
LocationSuperior, Douglas County, Wisconsin and Duluth, St. Louis County, Minnesota USA
Description
Primary Latest Change

Posted: Feb. 4, 2026, 9:54 a.m. EST This Invitation for Bid is being solicited as Full-and-Open Competition. Mobilize a dredge to the Duluth-Superior channel and perform mechanical dredging within the channel. Dredging will be required within the following areas: Dredge Area 3: Duluth Anchorage Area, Dredge Area 6: East Gate Basin, Dredge Area 11: Superior Front Channel (Near Barkers Island), Dredge Area 17: Superior Entry (between the pier structures and breakwater structures). The contract also includes options to perform additional dredging within Dredge Area 3 at the Duluth Anchorage Area and Dredge Area 14 near the mouth of the Nemadji River. Dredged material will be mechanically placed at the Erie Pier Confined Disposal Facility (CDF). Placement at this facility will require material to be washed to segregate fine to coarse grained sands from silty poorly draining material. The sand will have to be stockpiled on site. Every 10,000 CY of washed sand will require a sieve analysis to confirm the washing operations is sufficiently separating the fines from the sand. The Contractor would then demobilize when dredging and material placement are complete.

2 (Newest Update)

Posted: Feb. 25, 2026, 12:19 p.m. EST ***** Amendment 0001 is issued to extend the bid due date ***** This Invitation for Bid is being solicited as Full-and-Open Competition. Mobilize a dredge to the Duluth-Superior channel and perform mechanical dredging within the channel. Dredging will be required within the following areas: Dredge Area 3: Duluth Anchorage Area, Dredge Area 6: East Gate Basin, Dredge Area 11: Superior Front Channel (Near Barkers Island), Dredge Area 17: Superior Entry (between the pier structures and breakwater structures). The contract also includes options to perform additional dredging within Dredge Area 3 at the Duluth Anchorage Area and Dredge Area 14 near the mouth of the Nemadji River. Dredged material will be mechanically placed at the Erie Pier Confined Disposal Facility (CDF). Placement at this facility will require material to be washed to segregate fine to coarse grained sands from silty poorly draining material. The sand will have to be stockpiled on site. Every 10,000 CY of washed sand will require a sieve analysis to confirm the washing operations is sufficiently separating the fines from the sand. The Contractor would then demobilize when dredging and material placement are complete.

Current: Posted: Feb. 27, 2026, 7:31 a.m. EST ***** Amendment 0002 is issued to amend FAR 52.217-7 ***** ***** Amendment 0001 is issued to extend the bid due date ***** This Invitation for Bid is being solicited as Full-and-Open Competition. Mobilize a dredge to the Duluth-Superior channel and perform mechanical dredging within the channel. Dredging will be required within the following areas: Dredge Area 3: Duluth Anchorage Area, Dredge Area 6: East Gate Basin, Dredge Area 11: Superior Front Channel (Near Barkers Island), Dredge Area 17: Superior Entry (between the pier structures and breakwater structures). The contract also includes options to perform additional dredging within Dredge Area 3 at the Duluth Anchorage Area and Dredge Area 14 near the mouth of the Nemadji River. Dredged material will be mechanically placed at the Erie Pier Confined Disposal Facility (CDF). Placement at this facility will require material to be washed to segregate fine to coarse grained sands from silty poorly draining material. The sand will have to be stockpiled on site. Every 10,000 CY of washed sand will require a sieve analysis to confirm the washing operations is sufficiently separating the fines from the sand. The Contractor would then demobilize when dredging and material placement are complete.
Contacts
Contact nameJOSEPH ORLANDO
Contact emailjoseph.orlando@usace.army.mil
Contact phone(313) 226-2683
Secondary contact nameMichelle Barr
Secondary contact emailmichelle.barr@usace.army.mil
Secondary contact phoneNone