Annual Requirements Contract for Plumbing Supplies Countywide

Project ID: 607745-25 State|LocalOpportunities
Overview
AgencyClark County [NV]
Deadline06/30/26
Posted12/03/25
Estimated ValueNot Provided
Set AsideNot Provided
NAICSNot Provided
PSCNot Provided
LocationNevada
Description
Primary

Background

Clark County, Nevada is issuing an Invitation for Bid for an Annual Requirements Contract for Plumbing Supplies. The goal of this contract is to procure plumbing supplies necessary for the county's operations, ensuring that qualified firms or individuals can provide these essential materials efficiently.

Work Details

The contract includes various packages of plumbing supplies with estimated annual spends as follows: 1. Sloan Products (Package 1) - Estimated spend: $65,000. Includes Sloan items except repair parts. 2. Moen Products (Package 2) - Estimated spend: $55,000. Includes standard fittings and repair parts. 3. Acorn Products (Package 3) - Estimated spend: $120,000. Includes specific part numbers for air control valves, diaphragm assemblies, valve body assemblies, and solenoids. 4. Kohler Products (Package 4) - Estimated spend: $45,000. Includes standard fittings and fixtures. 5. Symmons Products (Package 5) - Estimated spend: $35,000. Includes standard fittings and repair parts. 6. Elkay Products (Package 6) - Estimated spend: $20,000. Includes standard fixtures and repair parts. 7. Chicago Products (Package 7) - Estimated spend: $22,000. Includes standard fittings and repair parts. 8. Bell & Gossett Pumps (Package 8) - Estimated spend: $85,000. Includes pumps and repair parts. 9. Taco Pumps (Package 9) - Estimated spend: $50,000. Includes pumps and repair parts. 10. Febco Backflows (Package 10) - Estimated spend: $40,000. Includes backflows and repair parts. 11. Nibco Valves (Package 11) - Estimated spend: $30,000. Includes various types of valves and fittings. 12. Willoughby Products (Package 12) - Estimated spend: $70,000. Includes standard fittings/fixtures and repair parts. 13. American Standard Products (Package 13) - Estimated spend: $30,000. Includes standard fittings/fixtures and repair parts. 14. A.O. Smith Water Heaters (Package 14) - Estimated spend: $510,000 with specific part numbers for various water heaters included. 15. Bradford White Water Heaters (Package 15) - Estimated spend: $100,000 with specific part numbers listed. 16. Cast Iron Pipe & Copper Pipe Type L (Package 16) - Estimated spend: $135,000 including various pipe sizes and types. 17. General Wire Plumbing Tools (Package 17) - Estimated spend: $45,000 for plumbing tools. 18. Spartan Plumbing Tools (Package 18) - Estimated spend: $35,000 for plumbing tools. 19. Watts Backflows (Package 19) - Estimated spend: $35,000 including backflows and repair parts. 20. Wilkins Backflows (Package 20) - Estimated spend: $35,000 including backflows and repair parts. 21. Nibco Products (Package 21) - Estimated spend: $50,000 including various press fittings.

Period of Performance

The contract will be performed over a period starting from the issue date of December 3rd, 2025 until the response deadline on December 17th, 2025.

Place of Performance

The performance will occur in Clark County, Nevada.

Bidder Requirements

Bidders must submit a Bidder's Statement of Authority to Submit Bid along with their proposal.

Same Region Opportunities

Wash Rack Maintenance

Agency: USBR Lower Colorado Basin Region, Boulder City, NV

Location: Nevada

NAICS: 811310