13 Opportunities Found
| Title | Status | Posted Date | Due Date |
|---|---|---|---|
| Local Let Maintenance Contract, Harris Co, Bridge Preventative Maintenance | Open | 6/16/26 | 7/14/26 |
| Local Let Maintenance Contract, Waller Co, Metal Beam Guard Fence Repair | Open | 6/16/26 | 7/14/26 |
| Local Let Maintenance Contract, Ector Co, Traffic Control Services | Open | 6/16/26 | 7/14/26 |
| Local Let Maintenance Contract, Brazoria Co, Ditch Cleaning And Reshaping | Open | 6/16/26 | 7/14/26 |
| Local Let Maintenance Contract, Harris Co, Large Sign Replacement | Open | 6/16/26 | 7/14/26 |
| Local Let Maintenance Contract, Galveston Co, Full Depth Concrete Repair | Open | 6/16/26 | 7/14/26 |
| Local Let Maintenance Contract, Waller Co, Bridge Preventative Maintenance | Open | 6/16/26 | 7/14/26 |
| CCure 9000 Series Software Support | Open | 6/16/26 | 7/2/26 |
| Local Let Maintenance Contract, Brazoria Co, Bridge Preventative Maintenance | Open | 6/16/26 | 7/14/26 |
| Local Let Maintenance Contract, Bell Co, Installation Of Traffic Signals | Open | 6/15/26 | 7/8/26 |
Activity Trend
13
7
0
Jul 25Aug 25Sep 25Oct 25Nov 25Dec 25Jan 26Feb 26Mar 26Apr 26May 26Jun 26
Avg: 1/month Peak: Jun 2026